Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 1 de 1
Filtrar
Adicionar filtros








Intervalo de ano
1.
Artigo em Inglês | IMSEAR | ID: sea-114175

RESUMO

The need for the disposal of iron ore tailings in an enviornmentally firiendly manner is of great concern. This paper investigates the soil engineering properties for the construction of iron ore tailing dam, its foundation, construction materials and design data used for the construction analysis of the tailing dam. Geophysical investigations were carried out to establish the bedrock below the spillway. A computer programme taking into account the Swedish Slip Circle Method of analysis was used in the stability analysis of dam. It also focuses on the charactierstics of the tailings reponsible for the determination of optimum size of tailing pond for the containment of the tailings. The studies on the settling characteristics of tailings indicate much less area in comparison to the area provided in the existing tailing ponds in India. In the proposed scheme, it is suggested to provide an additional unit of sedimentation tank before the disposal of tailings to the tailing pond.


Assuntos
Desenho Assistido por Computador , Conservação dos Recursos Naturais/métodos , Poluição Ambiental/prevenção & controle , Desenho de Equipamento , Análise de Falha de Equipamento , Filtração/instrumentação , Índia , Resíduos Industriais/prevenção & controle , Ferro/isolamento & purificação , Mineração/instrumentação , Eliminação de Resíduos/instrumentação
SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA